Thursday, May 26, 2011

Architectural Concrete continued

After buttoning up the forms, we hand-mixed about 7 cubic meters to finish up the architectural concrete section of the Lewis Cabin foundation. With help from an electric cement mixer and an excavator, it took us a good, long day to complete the pour. Below is a picture mid-pour, with the excavator nearly at full extension and bottom is after the wall was stripped, with two columns in the foreground, one central and one far right.

 