Sunday, July 31, 2011

Concrete wall pour #1: Success

NW Marine Dr foundation

So the concrete was poured last thursday and thewalls were stripped of the formwork on the inside.  The concrete is smooth, straight, even, and plumb.  It was a success!

In the picture below you can see that the concrete was "knocked-out", meaning that there was a void created for some purpose.  Inthis case you can see the steel I beam located directly above that was use to raise the house.  In order to lower the house we must knock-out the foudation to remove the steel beam.  the house will then be sitting on the foundation, after which we will fill in these voids with concrete.
NW marine dr Foundation knock-out