Monday, September 26, 2011

New framing in an old house

NW Marine DR--main floor framing


The main floor framing is underway with new psl headers, sistered floor joists, sistered wall studs and new floor sheathing.  There are also three interior walls that have been converted into shear walls for  seismic strength.  Keep current for a detailed shear wall post.

No comments:

Post a Comment