Maids Bedroom

Basement Stairs
After the concrete slab  cured for a few days the basement framing began.  Interior walls are built, shear walls are sheeted, blocked, and strapped as well as trying to get all the backing in for the drywall as we go.  The Basement stairs were built a quick as possible so that there was safe access for us.  

The framing continues at NW Marine drive today with the main floor stairs being completed and some concrete curbs being formed outside if the weather is nice.